

Introduction
ØEstablished in 1979 on a 4.4 sq. km.
Ø The plant came on stream in 1983, with an original
designed capacity of 800,000 metric tons per year and increased to exceed 2.8
million tons of reinforcing bars, wire rod and light sections.
ØThe first integrated iron and steel complex in Saudi
Arabia